Corrosion qualification for GCC coastal service

Salt Spray & Pitting Corrosion Testing

Validate machined, welded and coated components against the demanding chloride exposure found along the Arabian Gulf and Red Sea coasts. PartsMake provides in-house and independent salt spray programmes with traceable results for your materials, finishes and project requirements.

2,000 h

NSS exposure completed

480 h

CASS exposure completed

Zero

Red rust and blistering on validated configurations

Corrosion testing equipment for evaluating components in salt spray conditions
Controlled chamber exposure, followed by documented visual assessment and batch traceability.

Why qualify for the region?

Coastal exposure can challenge even established material choices.

High ambient temperatures, airborne chlorides and repeated wetting from seawater mist can accelerate pitting on stainless and carbon steels. Standard 316L may show early attack in these conditions; Super Duplex 2507 and nickel alloys also need documented performance evidence before site acceptance.

Test the complete configuration

Assess the specified alloy together with its machining, weld overlay, passivation or coating condition—not the material name alone.

Keep evidence traceable

Link each result to the part number, material heat and surface-treatment batch for review by project teams and inspectors.

Standards-led testing

NSS and CASS protocols, matched to the qualification need

Choose the exposure method and duration that align with your specification. Assessments record first red rust, blister size and corrosion creep from scribes using the stated rating references.

ASTM B117 neutral salt spray

NSS uses a 5% NaCl solution at 35 °C. Test panels and finished parts are exposed for 500, 1,000 or 2,000 hours, according to the agreed qualification plan.

Recorded assessment

First red rust, blister size and scribe creep, evaluated with reference to ASTM D1654 and ISO 4628-2/3.

Test capability

Controlled exposure, supported by inspection records

Temperature-controlled cabinets are monitored continuously for pH, salt concentration and chamber temperature. After exposure, calibrated microscopes and digital photography support evaluation.

01 / Monitor

Track chamber conditions

Continuous monitoring of pH, solution concentration and temperature during exposure.

02 / Inspect

Document visible performance

Use calibrated microscopy and photographs to record rust, blistering and corrosion creep.

03 / Trace

Connect results to the supplied batch

Log results against heat and batch numbers, then cross-reference EN 10204 3.1 material certificates and CMM inspection data.

Validated materials and finishes

Evidence for demanding component specifications

The material and finish configurations listed have completed 2,000 hours NSS and 480 hours CASS with zero red rust and no blistering or under-film corrosion.

Results apply to the tested configurations. Confirm the required finish, acceptance criteria and exposure plan for each order.

  • Super Duplex 2507 and 2205 After passivation
  • Inconel 625 and 718 With and without ENP
  • 316L Electropolished or hard anodised
  • Carbon steel With Inconel weld overlay
  • Aluminium 7075-T6 Type III hard coat

Reports with every batch

A clear record for quality review and site acceptance

Each order includes a corrosion test summary with exposure hours, visual rating and photographs. Where required, independent laboratory reports from ISO 17025 facilities in the UAE or KSA can be attached.

Report traceability includes

  • Exact part number and material heat
  • Surface-treatment batch
  • Exposure duration, visual assessment and photographs
  • Applicable test and rating references

GCC project applications

Flow control | Dammam and Jubail

Valve stems and wellhead components specified for 1,000-hour NSS before Aramco or ADNOC inspection.

SWRO packages | JAFZA and Yanbu

Laser-cut intake screens and manifolds requiring 2,000-hour evidence without pitting.

Data-centre cooling | Abu Dhabi

Copper cold plates and busbars requiring CASS exposure before liquid-cooling loops are commissioned.

Request a quotation

Share your test requirements

Send your drawings, material grade and target exposure hours. PartsMake will prepare a fixed-price quotation covering machining, surface treatment and the corresponding salt spray documentation package.

Delivery can be arranged DDP to Dammam, Musaffah or JAFZA as required.