JAFZA · KEZAD · GCC distribution
Free Zone Transit & Warehousing for Precision Components
PartsMake operates bonded storage and transit routes through JAFZA in Dubai and KEZAD in Abu Dhabi. Keep precision components close to regional demand, with tax-neutral holding and coordinated onward movement across the Gulf.
A practical regional hub for Tier-2 and Tier-3 contractors, distributors and MRO teams managing rotating stock and urgent repair requirements.
24h
Regional dispatch capability
2
Free zone locations
1 day
RFQ response target
Bonded holding
No UAE import duty applies while parts remain in the free zone.
Urgent repair support
Eligible orders received before 10:00 GST can reach Dammam or Musaffah the same calendar day.
GCC re-export coordination
Coordinate onward movement to Saudi Arabia, Qatar, Oman, Kuwait and Bahrain.
Flexible regional movement
Dispatch for urgent repairs or planned replenishment
Choose a route model around the component, delivery location and urgency. Dedicated air or road legs support rapid movement, while consolidated shipments help manage ongoing stock requirements.
A fast lane for emergency repair orders
Orders received before 10:00 Gulf Standard Time can reach Dammam Industrial City or Musaffah the same calendar day via dedicated air or road legs. Shipment documentation can include EN 10204 3.1 certificates and CMM reports verified at the point of manufacture.
Designed for time-critical valve, pump and manifold requirements.
Forward stock with consolidated releases
Weekly consolidated shipments can replace single urgent air-freight orders for Eastern Province valve automation shops, helping reduce landed cost per unit while meeting Aramco vendor documentation standards.
Release stock against your replenishment needs and nominated delivery point.
A connected operating model
From machining to free-zone stock to final destination
Integrate production, bonded storage and regional distribution to reduce unnecessary handling and support high-mix, low-volume supply programmes.
01 · Produce
Direct from in-house machining
Components from 5-axis mill-turn centres or wire EDM equipment move directly into the free-zone warehouse, without an intermediate customs step between machining and storage.
02 · Hold
Tax-neutral bonded storage
Parts held in JAFZA or KEZAD remain outside UAE customs territory. Import duty applies when goods clear for their final destination, helping avoid tying up capital in paid duties on rotating stock.
03 · Move
Coordinate onward distribution
Re-export from either free zone to GCC destinations, with SASO and SABER conformity certificates coordinated in advance for smoother clearance at Ras Laffan or Jubail entry points.
Programmes by application
Position the right inventory close to your project
JAFZA and KEZAD stock can support flow control, desalination and data centre cooling supply chains across the region.
JAFZA · Flow control
Valve automation stock for the Eastern Province
Forward stock for Inconel 718 and Super Duplex 2507 parts supports Eastern Province valve automation shops. Weekly consolidated shipments can reduce landed cost per unit while supporting Aramco vendor documentation standards.
KEZAD · Desalination
Inventory for skid builders
Desalination skid builders in Yanbu or Jeddah can draw on KEZAD inventory for Super Duplex impellers and laser-cut intake baskets. Release against blanket purchase orders, with neutral packaging and laser-etched identifiers applied on site.
JAFZA · Data centres
Routing for cooling components
Liquid cold-plate assemblies and copper busbars for NEOM and G42 projects can move through bonded stock. Micro-channel geometry revisions can be machined in 48 hours and placed at the same free-zone location for next-day integrator collection.
Request a quotation
Plan your JAFZA or KEZAD supply route
Send drawings or part numbers to info@partsmake.ae with the note “JAFZA/KEZAD RFQ”. Include your delivery location, required quantity and any certification level. A response with lead time and landed cost to the nominated free zone is provided within one business day.
- Include: drawings or part numbers, quantity and delivery location.
- Specify: required certification level and any project documentation needs.
- For urgent orders: share the required delivery date and destination to assess available routing.
Send your requirements
Share your enquiry and the team can review the appropriate free-zone location, documentation and regional route.