Traceable materials for GCC manufacturing

EN 10204 3.1 Material Certs for Machined Components in the GCC

PartsMake supplies finished mechanical parts with EN 10204 3.1 certificates issued against each material heat lot. Trace every component back to its original steel mill and furnace number, with the test results regional EPC contractors and operators need.

Standard supply is EN 10204 3.1. Where a project specification calls for it, an EN 10204 3.2 inspection route can be scoped with your enquiry.

Precision-machined metal component supplied with traceable material certification

Heat-lot

Traceability to the original melt

10–18 days

For eligible stocked-feedstock parts up to 400 mm cube

1 working day

Quote response with stock and certificate details

Certificate scope

The material record travels with the part

Each EN 10204 3.1 certificate is issued by the material producer and verified by an independent inspector. It connects the finished component to the raw bar or plate and the furnace batch number marked on the material.

A clear traceability chain

  1. 01Original steel mill and furnace number recorded against the heat lot.
  2. 02Raw bar or plate identification links the stock to its certificate.
  3. 03Scanned mill certificates are attached to the final inspection package before dispatch.

Chemical analysis

Composition from the melt

Complete chemical composition results from optical emission spectroscopy, recorded against the certified material heat.

Mechanical testing

Strength and ductility results

Tensile strength, yield strength and elongation are listed for the material batch.

Impact performance

Charpy V-notch values at the specified test temperature

The certificate records the impact-test temperature and absorbed energy values, supporting review against the project’s material requirements.

Manufacturing capability

Certified alloys, matched to the process

Select a capability to review work envelopes, tolerances, common alloys and typical deliverables. Mill certificates are scanned into the final inspection package before dispatch.

Discuss your requirements
Process Max envelope Tolerance Typical alloys with 3.1 certs Common GCC parts
5-Axis Milling1200 × 1000 × 800 mm±0.005 mmInconel 718, Super Duplex 2507, Ti-6Al-4VPump impellers, valve bodies
Mill-Turn 9-AxisØ420 × 1050 mm±0.005 mm17-4PH, Hastelloy C276, Monel 400High-pressure manifolds, wellhead spools
Heavy TurningØ850 × 2200 mm±0.008 mmAISI 4140, 316L, Inconel 625Long mandrels, drill collars
Gantry Milling3500 × 2200 × 1000 mm±0.020 mmStructural carbon steel, SS316Skid frames, tube sheets

GCC project fit

Documentation that supports real procurement needs

Align the material grade, manufacturing route and inspection records with the component’s operating environment and project documentation requirements.

Flow control · Dammam & Jubail

Tier-2 contractors need replacement valve trims in Inconel 718 or Super Duplex 2507 within three weeks. 5-axis capacity and pre-certified stock can help avoid the 24-week OEM wait while supplying the required 3.1 data book.

Skid packages · JAFZA & Yanbu

Small batches of Super Duplex manifolds and laser-slotted intake baskets ship with the plate certificate, PMI report and CMM log attached.

Data-centre cooling

Copper cold plates and busbars can be supplied with full chemical and mechanical traceability for high-temperature service. Vacuum-brazed assemblies retain the same 3.1 documentation on the base plate material.

Request pricing & lead time

Submit dimensions for a documented quote

Upload drawings or STEP files with the required material grade and any supplementary test demands. Receive pricing, current stock status and the exact certificate package within one working day.

Shipments to Dammam, Musaffah or Ras Laffan can be arranged DDP with SABER/SCOC documentation included.